Wednesday, April 22, 2009
FIRST FLOOR
this is how finished formwork with the reinforcement bar , BRC and tauhu. Before concreting better to provide conduit for wiring.
this is how its look from outside when formwork for first floor level finish. theres no space at ground flooor where we can work. have to finish this part then we can bring in the bricks.
this is how its look from outside when formwork for first floor level finish. theres no space at ground flooor where we can work. have to finish this part then we can bring in the bricks.
COLUMN
GROUND BEAM
FOOTINGS
finished pad footing with stump to finish at soofit of ground beam level. levelling and marking to determined floor heigh to be done before finalizing stump top end. Various size of footing to engrs drawings.
its a 6' x 6' x 1.5' pad footing. DPM to be layed before commencing any concrete works as to provide clean surface to work. T 16 reinforced bar has been layed at 4". adequate nos of "tauhu" or spacer to provide 2" bar offset from surface. starter bar for stump to be installed, positioned and hold with 2" x 1" "kokchai".
its a 6' x 6' x 1.5' pad footing. DPM to be layed before commencing any concrete works as to provide clean surface to work. T 16 reinforced bar has been layed at 4". adequate nos of "tauhu" or spacer to provide 2" bar offset from surface. starter bar for stump to be installed, positioned and hold with 2" x 1" "kokchai".